Emali town,Valley Road Area our Director decided to take bath,after a successfull commission of a a borehole depth of 100metres,Discharge 5m³/hr for Modern Farming of Onions
Asembo,Kametho Site Siaya County Borehole Depth 80metres Discharge 6m³/hr
Eng. Duncan Nganyi addressing Nyatigo Village,Seme Kisumu County at the launch of Nyatigo Tara Project Sponsored by Ms. Yvonne through the Switzerland Embassy. Project handled for a record period of 2months with a discharge of 8m³/hr. The Company did the Hydrogeological Survey,Drilling,Equipping, Solarization,Water Treatment,Tank Tower,Storage,Water Point Fending and Water Kiosk
The Company Director having a taste of the abstracted Water at Pap Onditi,Kisumu County. Client being the Area MCA with his 3td attempt in searching for Underground water. Eureka at last over 10m³/hr and with Community in Jubiliations
Kango Jaramogi Oginga Odinga,Nyamira area Siaya County borehole gravelling and filtration of a 80m.Water Stuck Level at 30m
Drilling at Utawala,Nairobi 250M WSLs(m) {155,187, 205}. For any Borehole related Services.The discharge was estimated at 20m³/hr. The whole project handled at a record time of 10days from Survey,Drilling,Equipping,Solarization, Tank Tower and Commissioning
Drilling at Utawala,Nairobi 250M WSLs(m) {155,187, 205}. For any Borehole related Services.The discharge was estimated at 20m³/hr. The whole project handled at a record time of 10days from Survey,Drilling,Equipping,Solarization, Tank Tower and Commissioning
Borehole Development through Compression at Maseno Diocese Church,Borehole regained discharge from 2m³/hr to 4m³/HR through 2hour Flushing Exercise
Test Pumping Exercise at Asembo,Kametho School with a discharge of 5m³/hr.
Kango Jaramogi Oginga Odinga,Nyamira area Siaya County borehole gravelling and filtration of a 80m.Water Stuck Level at 30m
Eng. Duncan Nganyi explaining the procedures followed till the end from Water Stuck Level to the depth of the borehole of 80m,this with the Hydrogeological Survey report formation graphs in mind. He is clearly showing that it was 100% occurances as had be forecasted on previous Geophysical Study conducted before the actual drilling exercise.
Borehole Rehabilitation at Ruiru Kenya. Eng. Duncan Nganyi taking through the processes involved in rehabilitation of a failed borehole.
Bondo Town at Koyucho Junction Siaya County,for an individual Client. Borehole of 120metres Water Stuck Level at 51metres. Fully commissiined
Borehole of 100metres at Atilili Bondo Town,Siaya County. An individual customer. Borehole fully done from Hydrogeological Survey , Drilling to Equipping.
School of Petals Ngochoni at Bondo Nyironge Migori County. Borehole at 156metres and WSL 76metres. Steel Casing in the process.
Pump Testing Exercise and further deepening of a poorly cased 60metres borehole at Mirogi,Ndhiwa Homabay County. The borehole was further deepened to 100metres that increased the discharge from 3.5m³/hr to 8m³/hr. This was done with guidance of Hydrogeological Survey report.